What MOQ and lead time should I expect for Dried jujube?
Suppliers quote very different minimums and lead times for Dried jujube.One 20GP or one pallet is a normal trial for Dried jujube; below that the sorting run is not worth it. Lead time is 20-35 days from deposit, plus the inspection slot.
页:
[1]